Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 52 results ...

AbulHassan, H S (2001) A framework for applying concurrent engineering principles to the construction industry, Unpublished PhD Thesis, , The Pennsylvania State University.

Akanmu, A A (2012) Towards cyber-physical systems integration in construction, Unpublished PhD Thesis, , Pennsylvania State University.

Balina, C M (2002) Using labor productivity data to evaluate the application of lean principles to the concrete construction process, Unpublished PhD Thesis, , Pennsylvania State University.

Bhawani, S (2021) A function-based lean construction methods ontology supporting the lean implementation planning process developed for construction projects, Unpublished PhD Thesis, , Pennsylvania State University.

Castronovo, F (2016) Assessing problem-solving skills in construction education with the virtual construction simulator, Unpublished PhD Thesis, , Pennsylvania State University.

Chen, C (2005) Entry strategies for international construction markets, Unpublished PhD Thesis, , The Pennsylvania State University.

Corbett, D I (1997) Quantifying quality in industrial construction, Unpublished PhD Thesis, , The Pennsylvania State University.

Dubler, C R (2011) Evaluating waste associated with building information exchange using lean theory, Unpublished PhD Thesis, , The Pennsylvania State University.

El-Aroud, A S (1980) Road network investment model for developing countries, Unpublished PhD Thesis, , Pennsylvania State University.

Enache-Pommer, E (2010) A synergistic approach to green building delivery, lean principles and building information modeling in the design of healthcare facilities, Unpublished PhD Thesis, , The Pennsylvania State University.

Franz, B W (2014) Modeling the role of team integration and group cohesion in construction project performance, Unpublished PhD Thesis, , Pennsylvania State University.

Gabrielli, M F (2009) Structural analysis of auction models, Unpublished PhD Thesis, , The Pennsylvania State University.

Gannon, E J (1998) A life-cycle cost model for use in the optimization of concrete bridge deck repair and rehabilitation, Unpublished PhD Thesis, , The Pennsylvania State University.

Gultekin, P (2015) An integrated process model and decision support system for energy efficient retrofits, Unpublished PhD Thesis, , The Pennsylvania State University.

Handojo, T (2001) The framework of a statistical acceptance plan based on the permanent deformation potential of asphalt concrete, Unpublished PhD Thesis, , Pennsylvania State University.

Hanna, A S (1989) An interactive knowledge-based formwork selection system for buildings, Unpublished PhD Thesis, , Pennsylvania State University.

Jafar Ramaji, I (2016) An integrated building information modeling (BIM) framework for multi-story modular buildings, Unpublished PhD Thesis, , Pennsylvania State University.

Jiang, L (2016) A constructability review ontology to support automated rule checking leveraging building information models, Unpublished PhD Thesis, , The Pennsylvania State University.

Jung, Y J (2007) Subsurface utility engineering for highway projects: A study of utility impact rating and benefit-cost analysis, Unpublished PhD Thesis, , Pennsylvania State University.

Kalamaras, G S (1996) A case method approach for interactive risk analysis of tunnel "design-for-constructability" concept, Unpublished PhD Thesis, , The Pennsylvania State University.

Kamel Hedayat Abad, M E (2017) Integration and interoperability of building envelope information and energy modeling, Unpublished PhD Thesis, , Pennsylvania State University.

Kerns, W R (1971) Criteria for determining economic priorities in awarding sewage facility construction grants, Unpublished PhD Thesis, , The Pennsylvania State University.

Klotz, L (2008) Process transparency for sustainable building delivery, Unpublished PhD Thesis, , Pennsylvania State University.

Konchar, M D (1997) A comparison of United States project delivery systems, Unpublished PhD Thesis, , The Pennsylvania State University.

Korkmaz, S (2007) Piloting evaluation metrics for high performance green building project delivery, Unpublished PhD Thesis, , The Pennsylvania State University.

Kreider, R G (2013) An ontology of the uses of building information modeling, Unpublished PhD Thesis, , Pennsylvania State University.

Kumar, S (2013) Experience-based design review of healthcare facilities using interactive virtual prototypes, Unpublished PhD Thesis, , The Pennsylvania State University.

Kuntz, K A (1994) A construction crew evaluation model to improve craft productivity, Unpublished PhD Thesis, , The Pennsylvania State University.

Lather, J I (2019) A hybrid modeling approach using discrete event simulation and layout optimization for healthcare layout planning problems, Unpublished PhD Thesis, , The Pennsylvania State University.

Leicht, R M (2009) A framework for planning effective collaboration using interactive workspaces, Unpublished PhD Thesis, , Pennsylvania State University.

Liu, F (2015) Integrated change and knowledge management for energy efficient retrofit projects, Unpublished PhD Thesis, , Pennsylvania State University.

Luo, Y (2008) Decision support for prefabrication strategy selection on building systems, Unpublished PhD Thesis, , Pennsylvania State University.

Lynch, T D (1996) A transaction cost framework for evaluating construction project organizations, Unpublished PhD Thesis, , Pennsylvania State University.

Mace, B K (2001) A production control model for commercial construction, Unpublished PhD Thesis, , Pennsylvania State University.

  • Type: Thesis
  • Keywords: coordination; market; construction project; building process; manufacturing; productivity; designer; supplier; project performance; case studies
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/250135256
  • Abstract:
    The poor coordination and control of crews many times leads to an inefficient work environment, unproductive work methods and decreased productivity. Inadequate support by designers, fabricators, suppliers and construction managers can also have a negative impact on productivity. Maximizing the productivity of construction crews is a key concern for projects with critical time-to-market requirements and when the industry experiences a shortage of skilled labor. The objective of this exploratory research was to define a model that incorporated modern production management theories to manage, control and support field crews. The model consists of three levels: construction crew, work area interactions and project functions. This model was developed by supplementing existing models of the building process with rules to control interactions between field crews and other project functions. These rules were developed by exploring modern production philosophies from the manufacturing industries. The hypothesis of this research was that a project with a closer fit to the model would perform significantly better than a project with less fit to the model. Performance was evaluated in terms of cost, schedule and quality. Case studies were used to measure the closeness of fit of construction projects to the model and to identify project performance. The focus was on the electrical trades. Seventeen projects from two major electrical contractors were studied. The level of model fit of the projects studied ranged from 50–78%. The data showed evidence that projects with a higher fit to the model had better cost, schedule and quality performance. Five individual rules were identified as having significant correlations with project performance.

Magent, C S (2005) A process and competency-based approach to high performance building design, Unpublished PhD Thesis, , The Pennsylvania State University.

McIntyre, C (1996) A decision support system for the residential land development site selection process, Unpublished PhD Thesis, , The Pennsylvania State University.

Messner, J I (1994) An information framework for evaluating international construction projects, Unpublished PhD Thesis, , Pennsylvania State University.

Mohammadpour, A (2014) Retrofitting healthcare facilities to enhance patient safety and energy efficiency, Unpublished PhD Thesis, , The Pennsylvania State University.

Mostavi, E (2018) Development of multiple criteria decision making instrument in designing of high performance commercial buildings, Unpublished PhD Thesis, , Pennsylvania State University.

Napolitan, C L (1995) Improvement to the forecast precision of the factor model for masonry productivity, Unpublished PhD Thesis, , Pennsylvania State University.

Nguyen, T-H (1999) Automated deduction of topological information in a computer-based building design system, Unpublished PhD Thesis, , The Pennsylvania State University.

Nikolić, D (2011) Evaluating a simulation game in construction engineering education: The virtual construction simulator 3, Unpublished PhD Thesis, , Pennsylvania State University.

Park, T i (2009) A comprehensive asset management system for sewer infrastructures, Unpublished PhD Thesis, , Pennsylvania State University.

Phelps, A F (2008) Lean information flow in complex healthcare projects and the role of the “integrator” as information flow manager, Unpublished PhD Thesis, , Pennsylvania State University.

Pulaski, M H (2005) The alignment of sustainability and constructability: A continuous value enhancement process, Unpublished PhD Thesis, , Pennsylvania State University.

Riley, D R (1994) Modeling the space behavior of construction activities, Unpublished PhD Thesis, , Pennsylvania State University.

Safari, M (2019) A regenerative approach to development and construction of building energy retrofit projects, Unpublished PhD Thesis, , Pennsylvania State University.

Sanders, S R (1989) An analysis of factors affecting labor productivity in masonry construction, Unpublished PhD Thesis, , Pennsylvania State University.

Solnosky, R L (2013) Integrated structural process model: An inclusive non-material specific approach to determining the required tasks and information exchanges for structural building information modeling, Unpublished PhD Thesis, , Pennsylvania State University.

Sprau Coulter, T L (2014) Improving energy audit process and report outcomes through planning initiatives, Unpublished PhD Thesis, , The Pennsylvania State University.

Syal, M G (1992) Construction process knowledge model to assist method selection in project planning, Unpublished PhD Thesis, , Pennsylvania State University.

Uhlik, F T, III (1984) Optimizing earthwork estimating for highway construction, Unpublished PhD Thesis, , Pennsylvania State University.